
Jakobshyttan
Customer Service Monday to Friday 8 a.m. to 4 p.m.
For traffic information and issues that requires immediate attention, we are open all hours.
Tel: +46 (0)771 921 921
The new railway is complete and was connected with existing track in 2014.
What have we built?
The new double track that goes past Jakobshyttan is a 3.5-km-long passing loop. Thanks to the new track, we have built a straighter railway. The railway has been adapted for the future double track between Hallsberg and Degerön. The passing loop increases capacity and allows for more flexible traffic.